Green Slabs
Say Goodbye to 90-Day Waiting Periods
Speed Up Your Construction Projects With Hydro-Block
When it comes to large construction projects, time is of the essence. Waiting for concrete to cure for 90 days before you can install flooring can be a major bottleneck in your project timeline. But what if we told you that there’s a game-changing solution that can slash that waiting period to just 14 days? Hydro-Block is the innovative concrete moisture mitigation system that is revolutionizing the construction industry.
The Challenge of Moisture in Concrete
Concrete slabs need time to cure properly before flooring can be installed. Rushing this process can lead to a host of problems, including adhesive failure, buckling, peeling, rust, mold, mildew, and more. Contractors often find themselves in a dilemma that leaves them with two options, either allow the concrete slab enough time to cure, or find a concrete moisture mitigation system that allows flooring installation before the slab is cured. Contractors are always trying to meet tight project deadlines without the risk flooring issues down the line. Hydro-Block offers a solution that allows you to have the best of both worlds by allowing contractors to install floor systems onto green slabs.
Transforming Concrete from Within
Hydro-Block isn’t your typical moisture mitigation system. It’s a penetrating sealer with superior technology and a unique design that sets it apart from the competition. Unlike other moisture mitigation systems, Hydro-Block can be applied to the concrete slab 1 hour after it is poured. Hydro-Block penetrates deep into the concrete, filling all the pores and solidifying the slab. This process not only creates a distinct waterproof barrier but also traps existing moisture inside the slab, preventing it from drying out and becoming brittle. The result? A permanently waterproofed, solid, and non-porous concrete slab that’s ready for flooring installation. This means you can skip the lengthy 90-day curing period and start installing your flooring in just 14 days.
The Hydro-Block Advantage
So, why choose Hydro-Block over other moisture mitigation systems? Here are some compelling reasons:
1. Speed and Efficiency
Hydro-Block significantly reduces project timelines by allowing flooring installation in just 14 days, compared to the standard 90-day wait. If you have an existing slab, you can install floors after only 6 hours of application. Hydro-Block is also fast to apply so there is very little downtime with labor installation. This means your projects can move forward faster, with minimal downtime.
2. No Added Thickness
Unlike many moisture mitigation systems that add extra thickness to the floor, Hydro-Block is a penetrating sealer that leaves your floors as they are. Its penetrating ability means there is no top layer or membrane that goes top of the concrete slab like a lot of our competitors. So there is no need to worry about altering your project’s specifications.
3. Warranty and Peace of Mind
We stand behind our product with a 25-year limited warranty. If any defects occur or if your flooring system is damaged by moisture emissions because our product failed, we’ll replace all of the defect products and cover the removal and replacement costs of a new flooring system. That’s our commitment to quality and your peace of mind. None of our competitors are as confident in their products as we are.
The Ultimate Solution to Eliminate 90-Day Waiting Periods and Expedite Construction Projects
Hydro-Block is a game-changer for general contractors looking to expedite their construction projects. Say goodbye to the 90-day waiting period and hello to faster, more efficient construction timelines. With its innovative technology and impressive warranty, Hydro-Block is the ultimate solution for concrete moisture mitigation. Make the smart choice today and experience the Hydro-Block advantage for yourself. Your projects will thank you.
Overview:
Hydro-Block is transforming construction timelines by replacing the standard 90 day concrete curing process with a swift 14 day process (for floor installation). With innovative technology and an impressive warranty, it’s the ultimate solution for efficient construction projects.
Features:
- New Slab: Install Floors After 14 Days
- Old Slab: Install Floors After 6 Hours
- No Additional Thickness Added
- 85% Cure Time Reduction
- Can Be Applied 1 Hour After Pour